Prepared from the standard-model product specification. General safety guidance follows the supplied English reference manual. Confirm machine-specific electrical details, operating limits and HMI functions on the delivered equipment.
PARAMETER | SPECIFIED VALUE |
Supported product | Various types of optical fiber; compatibility of each fiber type should be verified. |
Machine dimensions | 1,350 × 900 × 1,600 mm (height). |
Gross weight | Approximately 500 kg. |
Machine color | Pebble grey. |
Pay-off spool – maximum face diameter | Ø350 mm. |
Pay-off spool – center bore | Ø25.4 mm. |
Pay-off spool – maximum height | 300 mm. |
Take-up spool – maximum face diameter | Ø300 mm. |
Take-up spool – center bore | Ø25.4 mm. |
Take-up spool – maximum height | 250 mm. |
Maximum fiber traverse width | 200 mm. |
Working speed | Maximum 300 m/min, as stated in the main performance section. |
HMI adjustable speed range | 0–500 m/min, customizable, as stated in the control-system section; see Appendix A. |
Tension adjustment | Counterweight method, 5–80 g. |
Pay-off / take-up shaft diameter | Ø25.4 mm. |
Spool mounting | Spring-loaded center locking. |
Traction wheel | Ø160 mm, flat-bottom hard aluminum wheel. |
Length measurement | Active traction; length calculated from servo-motor rotation feedback. |
Tension feedback | Servo motors and displacement-sensor feedback for dynamic speed coordination. |
Control system | Servo motors, three-phase motor, inverter speed regulation and PLC control. |
This manual describes the customized fiber rewinding machine. Values expressly stated in the custom specification are presented as specified; general operating and maintenance guidance follows the supplied reference manual where appropriate.
SECTION | TOPIC |
1 | Safety instructions |
2 | Installation requirements |
3 | Technical specifications |
4 | Machine assemblies and working principle |
5 | Control system and HMI |
6 | Fiber routing and tension setup |
7 | Standard operating procedure |
8 | Maintenance and troubleshooting |
9 | Service and documentation |
A | Configuration confirmation checklist |
TERM | MEANING |
Pay-off | The supply spool and the mechanism that releases fiber. |
Take-up | The receiving spool and the mechanism that winds fiber. |
Traverse | The lateral movement used to arrange fiber across the receiving spool. |
Recipe | A saved set of winding parameters that can be selected and recalled on the HMI. |
Linear speed | Fiber travel speed expressed in m/min; it is not the same as spool rotational speed. |
Tension setting | The fiber tension adjusted by the counterweight system, specified as 5–80 g. |
DOCUMENT STATUS
This is a customer technical-review manual, not a released electrical schematic or fully validated machine-specific operating procedure. Items requiring confirmation are listed in Appendix A. HMI screenshots are reproduced from the supplied product specification; their displayed units and values must be checked on the delivered machine.
1. Safety instructions
Operation shall be limited to trained and authorized personnel familiar with optical fiber handling, machine motion, emergency response and the installed controls. Electrical work shall be performed only by qualified maintenance personnel.
·Keep hands, clothing and hair clear of spindles, traction wheels, guide rollers, tension mechanisms and traverse movement.
·Ensure spool locks are engaged before commanding motion. Do not adjust clamps or thread fiber while the machine is moving.
·Keep any installed guards, covers, interlocks and emergency-stop devices in working order. Never bypass safety devices.
·Stop operation if abnormal noise, vibration, fiber breakage, tension instability or an alarm message appears.
·Handle cut fiber carefully. Dispose of fiber scraps in a suitable container and use appropriate eye and hand protection.
The product specification states 380 V, 4 kW and a 5 × 2.5 mm² main power cable. It does not state the phase arrangement, frequency, protective-device ratings, terminal assignment or full wiring schedule. Verify the delivered electrical drawing and nameplate before connection.
ELECTRICAL ISOLATION
Emergency Stop and a software Stop command are not substitutes for disconnecting and isolating the incoming power supply before cabinet access, repair, cleaning or maintenance.
Use the machine in a clean, stable and adequately ventilated environment suitable for optical fiber processing. Keep the work area free of loose tools and fiber scraps. Avoid water spray, flammable atmospheres and corrosive fumes. Clean only after the machine has been safely stopped and isolated.
The product specification identifies a glue hopper for applying glue or coloring to the fiber. It does not identify the material chemistry, compatible formulations, application method, curing conditions or cleanup procedure. Use only process materials approved by the equipment supplier and follow the applicable material safety data sheet and supplier-issued process instruction.
OPERATOR RESPONSIBILITY
Follow the approved operating procedure and all machine safety notices. Do not restart while the cause of a fault or abnormal condition remains unresolved.
2.Installation requirements
Install the machine on a level, rigid surface suitable for the equipment mass and operating loads. The product specification does not define the required floor loading, installation clearance, ambient temperature, humidity or cleanliness class. Confirm these site requirements with the equipment supplier before installation.
ITEM | SPECIFIED INFORMATION |
Overall dimensions | 1,350 × 900 × 1,600 mm (height) – confirm dimension order against the final outline drawing. |
Gross machine weight | Approximately 500 kg. |
Enclosure color | Pebble grey. |
Installation surface | Level, rigid floor; floor-load capacity to be checked on site. |
Unloading / lifting | Use qualified rigging personnel and lifting points confirmed by the manufacturer. |
ITEM | SOURCE INFORMATION / ACTION |
Supply voltage | 380 V stated in the product specification. |
Total rated power | 4 kW. |
Main supply cable | 5 × 2.5 mm² stated; verify conductor assignment and suitability against the approved electrical drawing. |
Indicative energy use | Approximately 2 kWh per operating hour; source estimate, not a guaranteed measured draw. |
Phase / frequency | Not specified in the product specification; confirm before energizing. |
Protective devices / grounding | Confirm breaker, protective-earth arrangement and electrical protection requirements from the machine-specific drawings. |
CONFIRM BEFORE CONNECTION
Do not select or connect the power supply solely from the summary table. Verify the actual mains arrangement, protective grounding, cable assignment and electrical protection against the delivered machine nameplate and approved wiring documents.
·Inspect the machine for transport damage, enclosure stability and loose or damaged components.
·Verify the power connection, protective grounding and emergency-stop function against approved drawings.
·Provide sufficient working clearance for the specified spools, operator access, panel opening and routine maintenance.
·Inspect guide wheels, traction-wheel surface, tension components, spool shafts and locking devices for visible damage.
·Confirm the HMI software revision, PLC configuration, axis travel limits and commissioning parameters with the supplier.